Quality
Quality Policy
MDY Construction is dedicated to ensure that all of its activities are carried out to the highest possible standards and that building projects are:
- Built in accordance with specifications and drawings.
- In compliance with Building Regulations.
- In compliance with statutory requirements.
- In conformity with industry best practice.
- In compliance with Planning Conditions, where applicable.
- Completed to the satisfaction of the Design Team and Clients.
Quality Procedures
The Company operates a system of quality control from award of contract to handover, in which:
- Contract documentation is studied and evaluated.
- A system of work is developed.
- Sub-contractors are properly appointed.
- Each stage of the works is checked and validated.
- Conformity of materials to specification is ensured.
- Materials are tested where necessary.
- Quality records are maintained.
- All relevant documentation is compiled for inclusion in the Handover/Safety File.
Quality Management
MDY Construction management staff – contracts managers, site managers, engineers, quantity surveyors, safety manager – engage in a process of study and familiarisation with contract documentation prior to commencement on site and the appointment of sub-contractors. During the course of the works:
- Regular production meetings are held.
- Quality checks and sign-off sheets are completed.
- Materials are tested.
- Data sheets and accreditation documentation are procured.
- Quality is continuously monitored by site management.
- Compliance with quality procedures is enforced by contracts managers.